[rev_slider alias=”deer-creek-mine”]

In 2015, AAI completed approximately 60 bulkhead grouting holes, some of which were full-face and others were cored.  AAI also completed two 300-foot vertical up-holes from underground to surface.  AAI drilled two holes from the mine portal to underground and reamed the holes to 6 inches diameter.  Drilling was part of Energy West’s permanent closure activities at the Deer Creek Mine.

Instagram

Visit our active drilling projects on Instagram.

Related Projects
Contact Us

Send us an email and we'll get back to you asap.

Not readable? Change text. captcha txt